Emergency
Emergency Flood Restoration
A comprehensive repiping project for a 3-story residential building built in 1960. The project involved replacing all outdated galvanized pipes with modern copper piping throughout the entire property while maintaining full habitability during the renovation process.
The Challenge
Meeting strict health department regulations while coordinating with other trades in a tight construction schedule. The kitchen required specialized grease management and high-volume water supply.
Our Solution
We designed a custom plumbing layout that exceeded health code requirements and coordinated closely with the general contractor to sequence our work efficiently. Used commercial-grade fixtures rated for heavy daily use.
Results & Achievements
- Passed health department inspection with commendation
- Zero leaks or callbacks after opening
- Grease trap system performing optimally
- All equipment commissioned successfully
- Client opened 1 week early due to our efficiency
Project Gallery




